Local Data Search
 
USA.com / Transco Compressor Station 130

Transco Compressor Station 130

 

117 Winns Lake Road
Comer GA, 30629
View Full EPA Profile

Create Date: 2000-03-01
Facility Site Type: Stationary

Environmental Interest Types:

AIR MAJOR:A Clean Air Act Stationary Source Major discharger of air pollutants according to the Alabama power decision's definition of a major source or the 1993 EPA Compliance Monitoring Branch Classification Guidance. A facility is classified as a Major Discharger if: * Actual or potential emissions are above the applicable major source thresholds, or * Actual or potential controlled emissions > 100 tons/year as per Alabama power decision, or * Unregulated pollutant actual or potential controlled emissions > 100 tons/year as per Alabama power decision.
COMPLIANCE ACTIVITY:A compliance monitoring or enforcement activity, from the time an inspector conducts an inspection until the time the inspector closes or the case settles the enforcement action.
CRITERIA AND HAZARDOUS AIR POLLUTANT INVENTORY:A national inventory of emissions data of both hazardous air pollutants (HAPs) and criteria air pollutants. Criteria air pollutants include ozone, carbon monoxide, nitrogen oxides, sulfur oxides, lead, and fine particulate matter and HAPs, or air toxics, are defined in section 112(b) of the 1990 clean air act amendments.
GREENHOUSE GAS REPORTER:Greenhouse gas reporters are required to annually report greenhouse gases (GHGs) from large GHG emission sources in the united states. Implementation of 40 CFR part 98 is referred to as the greenhouse gas reporting program (GHGRP) and applies to direct GHG emitters, fossil fuel suppliers, industrial gas suppliers, and facilities that inject CO2 underground for sequestration or other reasons. In general, the threshold for reporting is 25,000 metric tons or more of carbon dioxide (CO2) equivalent per year. Reporting is at the facility level, except for certain suppliers of fossil fuels and industrial greenhouse gases.
HAZARDOUS WASTE BIENNIAL REPORTER:Under the authority of Sections 3002 and 3004 of the Resource Conservation and Recovery Act of 1976 (RCRA), as amended by the Hazardous and Solid Waste Amendments of 1984 (HSWA), hazardous waste generators and treatment, storage, and disposal facilities are required to report to the EPA or the authorized States, at least every two years, the quantities, nature, and disposition of hazardous waste.
SQG:Hazardous Waste Small Quantity Generators (SQGs) generate: * More than 100 and less than 1000 kilograms of hazardous waste during any calendar month and accumulate less than 6000 kg of hazardous waste at any time; or * 100 kg or less of hazardous waste during any calendar month, and accumulate more than 1000 kg of hazardous waste at any time.

NAICS Code:

486210:Pipeline Transportation of Natural Gas

SIC Code:

4922:Natural Gas Transmission

Popular Rankings
Fastest / Slowest Growing Cities in GA
Fastest / Slowest Growing States in U.S.
Best / Worst Cities in GA by % of Males Employed
Best / Worst States in U.S. by % of Males Employed
Best / Worst Cities in GA by % of Females Employed
Best / Worst States in U.S. by % of Females Employed
Best / Worst Cities by Crime Rate in GA
Best / Worst States by Crime Rate in U.S.
Richest / Poorest Cities by Income in GA
Richest / Poorest States by Income in U.S.
Most Expensive / Cheapest Homes by City in GA
Most Expensive / Cheapest Homes by State in U.S.
Most / Least Educated Cities in GA
Most / Least Educated States in U.S.
 
The USA.com website and domain are privately owned and are not operated by or affiliated with any government or municipal authority.
© 2025 World Media Group, LLC.